Yulin High-tech Zone

source:Silk Road Dialogue Committee|Release time:2023-02-16|Number of views:
Yulin High-tech Zone Aluminum Magnesium Alloy Production Project with
an annual output of 1 million tons



Project content: construction of an aluminum magnesium alloy production line with an annual output of 1 million tons and supporting auxiliary facilities. The total floor area is 5000 mu; The total construction area is 2.34 million square meters; The main buildings include various production plants, warehouses, production dispatching control centers, technology development centers, quality control centers, office buildings, staff dormitories, fire rooms, etc; Supporting facilities include boiler room, power distribution room, sewage treatment system, parking lot, hardened road, green belt, etc.

Total investment and cooperation mode: the total investment is 4.5 billion yuan, including 2.7 billion yuan of construction investment and 1.8 billion yuan of initial working capital.

Cooperation mode: joint venture.

Market forecast and investment return analysis: aluminum-magnesium alloy has the advantages of light weight (only 2/3 of aluminum alloy), high specific strength and stiffness, good electromagnetic wave shielding effect, heat dissipation and shock absorption, and is widely used in aerospace, transportation, machinery and electronics, instrumentation and other industries. At present, the global consumption and growth rate of aluminum-magnesium alloy has also been far greater than that of steel, aluminum alloy, zinc, copper and other materials. The domestic aluminum-magnesium alloy products are in a serious state of oversupply, and the market development prospect is extremely broad. The annual operating revenue is 13 billion yuan after reaching the production capacity; The average annual profit is 1.35 billion yuan; After-tax financial internal rate of return 26.5%; The static payback period (after income tax, including the construction period) is 6 years.